Terms of Service

Last Updated: November 27, 2026

These Terms of Service govern all services provided by Concrete Contractors of Bellflower, referred to herein as the company, we, us, or our, to any customer, property owner, or authorized representative, referred to herein as the customer, you, or your. By requesting an estimate, signing a proposal or contract, scheduling work, or otherwise engaging our services, you acknowledge that you have read, understood, and agree to be bound by these Terms. Where a separate written contract exists between you and the company, that contract shall control in the event of any conflict with these Terms. These Terms are intended to supplement, and not replace, any rights or obligations required under California law, including the California Business and Professions Code and applicable home improvement contract requirements.

1. Description of Services

Concrete Contractors of Bellflower provides residential and light commercial concrete construction and related services in Bellflower, California and surrounding communities. Services may include, without limitation, the installation, repair, replacement, and removal of driveways, patios, sidewalks, walkways, slabs, foundations, steps, curbs, retaining walls, decorative and stamped concrete, and concrete resurfacing and sealing. The specific scope of work, materials, dimensions, finishes, timeline, and price for each project shall be set forth in a written estimate, proposal, or contract. Any work not expressly described in the written scope of work is excluded unless added through a signed change order. Estimates are based on visible site conditions and information provided by the customer at the time of inspection and are valid for thirty (30) days from the date of issuance unless otherwise stated. The company reserves the right to decline any project at its sole discretion.

2. Customer Obligations

The customer agrees to: (a) provide accurate and complete information regarding the property, intended use of the work, and any known site conditions, including underground utilities, irrigation lines, sprinkler systems, septic systems, drainage features, or prior soil issues; (b) confirm that the customer owns the property or has legal authority to authorize the work; (c) provide safe, reasonable, and unobstructed access to the work area, including access for trucks and equipment, during scheduled work hours; (d) remove vehicles, furniture, landscaping items, and personal property from the work area prior to the start of work; (e) clearly identify property lines, and resolve any boundary disputes with neighbors before work begins; (f) obtain any homeowners association approvals required for the project unless the company has agreed in writing to do so; (g) keep children, pets, and vehicles off newly placed concrete for the curing periods recommended by the company; and (h) follow all post-installation care and maintenance instructions provided by the company. The company shall not be responsible for delays, damages, or additional costs resulting from the customer's failure to meet these obligations.

3. Permits, Utilities, and Site Conditions

Unless otherwise specified in the written contract, the company will coordinate with Underground Service Alert (DigAlert) prior to excavation as required by California law. However, the company is not responsible for damage to private, unmarked underground lines, including but not limited to sprinkler lines, low-voltage wiring, private gas or water lines, and septic components, that were not disclosed by the customer. Where building permits are required, responsibility for obtaining them shall be designated in the written contract, and permit fees shall be paid by the customer unless otherwise agreed. If concealed or unforeseen conditions are encountered, including buried debris, expansive or unstable soil, tree roots, rock, groundwater, or deteriorated existing structures, the company will notify the customer, and any additional work required will be performed only upon execution of a written change order specifying the additional cost and time.

4. Payment Terms

Payment terms shall be set forth in the written contract. Any deposit or down payment shall comply with California law, which generally limits down payments on home improvement contracts to the lesser of ten percent (10%) of the contract price or one thousand dollars ($1,000). Progress payments, if applicable, shall not exceed the value of work performed and materials delivered at the time of payment. The final balance is due upon substantial completion of the work unless otherwise agreed in writing. Accepted payment methods will be specified in the contract or invoice. Balances not paid when due may accrue a late charge at the lesser of one and one-half percent (1.5%) per month or the maximum rate permitted by law. Returned payments may be subject to a fee as permitted by California law. The customer is advised that, under California law, contractors, subcontractors, and material suppliers who are not paid may have the right to record a mechanics lien against the property. The company reserves the right to suspend work for non-payment after providing written notice. The customer shall be responsible for reasonable collection costs and attorney fees incurred to collect unpaid amounts, to the extent permitted by law.

5. Change Orders

Any modification to the scope of work, materials, finishes, or schedule must be documented in a written change order signed by both the customer and the company before the changed work is performed. Each change order shall describe the change, the adjustment to the contract price, and any effect on the completion schedule. Verbal requests or approvals shall not be binding on either party.

6. Scheduling, Weather, and Delays

Project start and completion dates are good-faith estimates. Concrete work is highly sensitive to weather conditions, and the company may reschedule work due to rain, extreme heat, high winds, or other conditions that may compromise the quality of the work. The company shall not be liable for delays caused by weather, material shortages, supplier or ready-mix plant delays, permit or inspection delays, acts of government authorities, labor disputes, natural disasters, the customer's actions or omissions, or any other cause beyond the company's reasonable control. In such cases, the completion schedule shall be extended for a reasonable period.

7. Cancellation Policy

Right to Cancel: Where applicable under California law, including for home improvement contracts solicited or signed at the customer's residence, the customer may cancel the contract without penalty within three (3) business days after signing, or such longer period as required by law, by providing written notice to the company as described in the notice of cancellation provided with the contract. Any payments made will be refunded in accordance with California law. Cancellation After Rescission Period: If the customer cancels after the statutory rescission period has expired but before work begins, the customer shall be responsible for the reasonable costs actually incurred by the company, including non-refundable material orders, special-order items, permit fees, and design or engineering costs, which may be deducted from any deposit. If the customer cancels after work has begun, the customer shall pay for all work performed and materials delivered through the date of cancellation, plus any documented non-refundable costs. Rescheduling: The customer may reschedule a confirmed work date by providing at least forty-eight (48) hours notice. Late cancellations or rescheduling on the day concrete is scheduled to be delivered may result in charges for ready-mix delivery, short-load, or crew mobilization fees actually incurred. Cancellation by the Company: The company may cancel or suspend services if the customer fails to make required payments, fails to provide site access, or if unsafe conditions exist. In such cases, the customer shall pay for all work completed to date.

8. Nature of Concrete and Customer Acknowledgments

The customer acknowledges that concrete is a natural material subject to inherent characteristics that do not constitute defects. These include: hairline and shrinkage cracking, which may occur despite proper installation and the use of control joints; minor variations in color, shade, and texture, particularly between separate pours or when matching existing concrete; surface imperfections in decorative or stamped finishes; efflorescence; and minor settling. The company makes every reasonable effort to minimize cracking but does not guarantee that concrete will be crack-free. Damage caused by heavy vehicles or equipment exceeding the design load of the installation, deicing chemicals, improper drainage, tree roots, soil movement, or the customer's failure to follow care instructions is not the responsibility of the company.

9. Warranties

Limited Workmanship Warranty: Unless a different warranty period is stated in the written contract, the company warrants that its workmanship will be free from material defects for a period of one (1) year from the date of substantial completion. Covered defects include structural failure, significant scaling or spalling, and cracks exceeding one-quarter inch (1/4 inch) in width or vertical displacement, where such conditions result from faulty workmanship. Warranty Remedy: The company's sole obligation under this warranty shall be, at its discretion, to repair or replace the defective work or refund the portion of the contract price attributable to the defective work. Repairs may not perfectly match the color or texture of the surrounding concrete. Exclusions: This warranty does not cover normal hairline or shrinkage cracking; color variations; damage from settling of soil not compacted by the company; tree roots; earthquakes, floods, or other acts of nature; overloading; misuse, abuse, or neglect; improper maintenance; freeze-thaw or chemical damage; alterations or repairs performed by others; or pre-existing conditions. Materials are covered only to the extent of the manufacturer's warranty, if any. Claims: Warranty claims must be submitted in writing within the warranty period and within thirty (30) days of discovering the defect. The warranty is void if the contract balance has not been paid in full. Disclaimer: Except as expressly stated herein or as required by law, the company disclaims all other warranties, express or implied, including implied warranties of merchantability and fitness for a particular purpose. Nothing in these Terms limits any non-waivable rights the customer may have under California law.

10. Limitation of Liability

To the fullest extent permitted by law, the company's total liability arising out of or relating to any project or these Terms, whether in contract, tort, or otherwise, shall not exceed the total amount paid by the customer to the company for the specific project giving rise to the claim. In no event shall the company be liable for any indirect, incidental, consequential, special, or punitive damages, including loss of use, loss of rental income, diminution in property value, or inconvenience. The company is not responsible for incidental damage to lawns, landscaping, sprinkler systems, or driveways caused by the necessary movement of trucks and equipment to access the work area, though reasonable care will be exercised. The company maintains general liability insurance and workers compensation insurance as required by California law. Nothing in this section shall limit liability for gross negligence, willful misconduct, or any liability that cannot be limited under applicable law.

11. Indemnification

The customer agrees to indemnify and hold harmless the company, its owners, employees, and subcontractors from any claims, losses, or expenses, including reasonable attorney fees, arising from the customer's breach of these Terms, inaccurate information provided by the customer, undisclosed site conditions, boundary disputes, or the acts or omissions of the customer or the customer's guests, agents, or other contractors.

12. Dispute Resolution

The parties agree to attempt in good faith to resolve any dispute arising out of or relating to these Terms or the services provided. The customer shall first notify the company in writing describing the nature of the dispute, and the parties shall make reasonable efforts to resolve the matter informally within thirty (30) days. If the dispute is not resolved informally, the parties agree to attempt non-binding mediation in Los Angeles County, California, with mediation costs shared equally, before initiating litigation. If mediation is unsuccessful, either party may pursue available legal remedies in a court of competent jurisdiction, including small claims court where the amount in controversy is within its jurisdictional limits. Any arbitration provision will apply only if separately agreed to in the written contract in a form compliant with California law. The customer is also advised that complaints regarding licensed contractors may be submitted to the Contractors State License Board. In any legal action to enforce these Terms or collect amounts due, the prevailing party shall be entitled to recover reasonable attorney fees and costs, to the extent permitted by law.

13. Governing Law and Venue

These Terms and all services provided by the company shall be governed by and construed in accordance with the laws of the State of California, without regard to its conflict of law principles. Subject to the dispute resolution provisions above, any legal action arising out of or relating to these Terms shall be brought exclusively in the state courts located in Los Angeles County, California, and the parties consent to the personal jurisdiction of such courts.

14. Photographs and Publicity

The company may photograph completed work for its records, quality control, and marketing purposes, including on its website and social media. The company will not publish the customer's name, address, or other identifying personal information without consent. Customers who prefer that their project not be photographed for marketing purposes may notify the company in writing.

15. Miscellaneous Provisions

Entire Agreement: These Terms, together with any written estimate, contract, and signed change orders, constitute the entire agreement between the parties and supersede all prior oral or written understandings. Severability: If any provision of these Terms is found to be invalid or unenforceable, the remaining provisions shall remain in full force and effect. Waiver: The failure of the company to enforce any provision shall not constitute a waiver of its right to do so later. Assignment: The customer may not assign any rights under these Terms without the company's written consent. Subcontractors: The company may engage qualified subcontractors to perform portions of the work. Modifications: The company may update these Terms from time to time; the version in effect at the time a contract is signed shall govern that project.

If you have any questions regarding these Terms of Service, wish to submit a written notice of cancellation, warranty claim, or dispute, or require further information about our services, please contact Concrete Contractors of Bellflower at general@concretecontractorsofbellflower.com. We are committed to serving the Bellflower community and surrounding areas with quality concrete work and will make every reasonable effort to respond to inquiries promptly.